Industrial floor system cost & 15-year TCO estimator

Model turnkey installed cost, return-to-service time and 15-year cost of ownership for ten industrial floor systems — with surface prep, ASTM F2170 moisture mitigation, integral cove, joint work and shutdown premiums itemized.

1 Facility area
sq ft
2 Operating environment
3 Flooring system
4 Existing slab condition
5 Slab moisture (ASTM F2170 RH)
6 Integral sanitary cove base
Height
7 Control joints
$1.50–$3.50/LF
$15–$45/LF
8 Installation schedule

Turnkey installed cost

—

—

Low—
Mid—
High—

Itemized scope

LineLowHigh

Return to service

CSI MasterFormat & prep

15-year total cost of ownership

Preliminary budget for planning only, based on 2025–2026 US commercial turnkey ranges. Final pricing requires a site assessment and ASTM F2170 results. Methodology.

Request Site Assessment With This Scope

How the estimate is built

What is inside each line

LineBasisRange
Base floor systemInstalled $/sf by system, standard ICRI CSP prep included$1.50–$16.00/sf
Small-project upliftUnder 2,000 sf, resinous systems; $5,000 project minimum on all systems+20% to +35%
Scale savingsResinous systems: 20,000+ sf / 50,000+ sf. Polished concrete uses its own large/small rates−12% to −22% / −20% to −30%
Removal & degreasingThin sealer or paint / failing thick coating, mastic, oil+$1.00–$1.75 / +$2.00–$3.25 per sf
Moisture mitigationEpoxy, ESD, MMA and thin urethane at elevated or high RH$2.25–$3.50 / $3.50–$6.00 per sf
Integral coveEpoxy-family vs. urethane cement rate, 4 in. lower half / 6 in. upper half$10–$15 / $15–$20 per LF
JointsPreventative polyurea fill / spalled joint rebuild$1.50–$3.50 / $15–$45 per LF
Shift premiumNight, weekend, phased plant shutdown on the installed subtotal+15% low · +18% mid · +25% high